Indrustrial hall LIKO-VO

Category:

GREEN WALLS

Project general details

Nominator

Investor

Supplier

Architect

Liko-s a.s.

Liko-s a.s.

Liko-s a.s.

Liko-s a.s.

Location (City)

GPS

Country

Region

Year of nomination

Slavkov u Brna

data

Czechia

Europe

2024

Project specifications

LIKO-S, the leading production and construction family company from Slavkov u Brna, inaugurated the world's first living hall - LIKO-Vo on June 18, 2019. The grand opening ocurred under the auspices of the Minister of the Environment and was attended by the Deputy Prime Minister Karel Havlíček. Compared to other industrial buildings, which warms the surrounding air to up to 80 ° C, LIKO-Vo limits the amount of heat radiation and as a result its surroundings are up to 10 ° C cooler. “Conventional halls covered with standard materials generate huge amounts of heat and act as radiators. In fact, the construction industry in the Czech Republic daily devours 10 hectares of vegetated land, which then cease to retain water. Green buildings are able to eliminate these phenomena, ”says Libor Musil, the founder of LIKO-S.

Object type

Green wall area (m2)

Year of completion

Project in operation?

Commercial buildings

150

2019

YES

Green wall specification

Method of establishment of vegetation

Vegetation is cultivated in stainless steel baskets lined with non-woven fabric with an extensive substrate

Vegetation

DRY FLOWER MEADOW - 58 species

Vegetation layer

pre-grown herb mixture in exterior substrate

Retention layer

All of the waste water from the building is naturally purified and re-used for irrigation. We also have a rain garden to soak up the water for the roof ang terasse.

Filtration layer

Root wastewater treatment plant. The purified water is then used to water the green walls of the hall. The gray water does not go into the sewerage system, but is used directly on the site.

Drainage layer

PVC pond film FATRA is suitable for ornamental garden ponds. FATRA pond films are stable under UV radiation, easy to weld, chemically resistant, harmless to fish and aquatic plants, resistant to mechanical damage. Aquaplast 805 films have a long-term fault-free waterproofing function and a service life of 20 years.

Separate layer

The green facade is installed as a ventilated facade, thermal bridges do not form on the building and thus the building is protected

Protective layer

The green facade is installed as a ventilated facade, thermal bridges do not form on the building and thus the building is protected

Root layer

Plant roots are stabilized in a stainless steel basket lined with non-woven fabric and planted in an extensive substrate